23d 21h Left
Winchester Model 61 Slide Action Rifle with Box{"message":"In _app.tsx child of Layout","renderCount":1}
Winchester 22 long leader staynless old box
Lot Closed
Auction by Anstine Auctions, LLC(301)
This item is in Kingsville, MO
Similar Items
13d 1h Left
WINCHESTER BOX OF (50) 22 SHORT CARTRIDGES17d 3h Left
50 Rounds Winchester Western X 32 Long Colt 82gr Lead Ammunition$10.0017d 3h Left
50 Rounds Winchester 1986 Limited Edition 22 WRF Ammunition$10.004d 3h Left
20 Rounds Winchester 300 H&H Magnum$3.0010d 1h Left
Winchester 67 .22 SHORT, LONG, LONG RIFLE13d 8h Left
500 Rounds Winchester Wildcat 2222d 0h Left
Remington/Winchester .30-30 Ammunition 120 Rds$75.0022d 21h Left
Winchester Model 61 Slide Action Rifle with Box22d 0h Left
Estate Rifles .22 2 Pcs Lot Rifles$125.0023d 21h Left
Pre-World War II Winchester Model 62 Rifle with Factory Box$1,200.0012d 20h Left
WINCHESTER M1906 .22 SLIDE ACTION TAKEDOWN RIFLE21d 21h Left
Winchester Model 61 Slide Action Rifle with Box22d 0h Left
Estate Rifles .22 2 Pcs Lot Rifles23d 21h Left
Winchester Model 61 Smoothbore Rifle$2,500.0017d 1h Left
Vintage Box Winchester 405 WIN 300gr SP Ammunition$10.001d 23h Left
Vintage Winchester Western .22 Savage High Power 70 Gr. SP; 20 Rds.$22.003d 7h Left
One Long Pistol Magazine DW1d 23h Left
Winchester Model 190 .22 S/L/LR Tube Fed Semi-Automatic Rifle w/Deluxe Checkered Stock; SN 797529$110.0024d 1h Left
WINCHESTER MODEL 9422 .22 SHORT/LONG/LR CALIBER LEVER ACTION CARBINE$325.0022d 0h Left
Miscellaneous Estate Ammunition Lot1d 22h Left
Winchester Model 1890 .22 Long Pump Action Rifle$180.001d 23h Left
Winchester Model 190 .22 LR Semi-Automatic Tube Fed Rifle w/Vintage K-Mart All Pro 4x15 Scope; SN B1$95.0022d 0h Left
Estate Rifles .22 2 Pcs Lot Rifles$100.0022d 0h Left
Remington/Hornady .338 Win Mag Ammo 58 RdsOverview of Winchester 22 long leader staynless old box
Item Details
Payment
ALL ITEMS MUST BE PAID FOR IN FULL AND FFL MUSTBE RECEIVED BEFORE ANY ITEMS WILL BE SHIPPED
CheckMoney OrderWire TransferCash
Auction Details
RARE COLLECTION OF GUNS/COINS/STOCKYARD MEMORBILLAPO Box 98, Kingsville, MO, 64061Friday, May 4, 2018 | 10:30 AM CDT
Auction House
Terms Of Sale
NO GUNS WILL BE SOLD TO THE STATE OF CALIFORNIA. ALL GUNS WILL BE SHIPPED TO YOUR LOCAL FFL GUN DEALER UNLESS YOU HAVE A FFL. SHIPPING FOR HAND GUNS WILL BE $25 AND RIFLES WILL BE $30. THERE MOST LIKLEY WILL BE A FEE FROM YOUR LOCAL FFL PERSON