28,000± SF Pre-Engineered Metal Building

28,000± SF Pre-Engineered Metal Building

Bidding ends Friday, March 27, 2020  |  3:30 PM Eastern
Auction closed.
28,000± SF Pre-Engineered Metal Building

28,000± SF Pre-Engineered Metal Building

Bidding ends Friday, March 27, 2020  |  3:30 PM Eastern
Auction closed.
Internet Premium: 13%
Instant Financing | Low PaymentsSee Special Terms for additional fees
Share:

Description

Public Auction - 28,000± SF Pre-Engineered Metal Double A-Frame Building (BUILDING ONLY - NO REAL ESTATE). THIS LOT STARTS CLOSING 03.27.20 @ 3:30PM EDT.

Motleys Industrial


804-232-3300 x3
Catalog Terms of sale
Search Catalog :
Sort By :
Go to Lot :
Go to Page :
Per Page :
Pg : 1 of 1

Closed Lots

28,000+/- SF Pre-Engineered Metal Double A-Frame Building (BUILDING ONLY - NO REAL ESTATE)

Lot # 1      

28,000+/- SF Pre-Engineered Metal Double A-Frame Building (BUILDING ONLY - NO REAL ESTATE).

PLEASE NOTE:  A Contractor is Available to Disassemble the Building, Label Each Piece for Re-Install and Load on Flatbed Truck for Delivery. Price:  $14,500.  Call for details. 
...more

Bid Not Accepted!

Bid Accepted!

You've been outbid!

Sold for: USD 41,000.00

You've been outbid  to d****9! to YOU!

Placing your bid. please wait...

Search Catalog :
Sort By :
Go to Lot :
Go to Page :
Per Page :
Pg : 1 of 1

1.178.0.771.56c32e2.9.110