|
|
Insurance Claim: Building / Finishing Materials Lot #2 (Sale Order 1 of 1) On July 21st, 2019, water damaged the materials that were still in their boxes. The glue caused surface damage to the materials that were to be installed as a finished surface. Claim Value: $129,217. Inventory list is located on the 2nd image on this lot. Please note that the material is located in two locations; one is Aurora, Missouri, and the other is on Lowell, Arkansas. The majority of the product is in Aurora, Mo.
|
|