Print Show Images  
Proxibid - It''s all in the Marketplace

28,000± SF Pre-Engineered Metal Building

Heavy Construction Equipment  >  Motleys Industrial  >  28,000± SF Pre-Engineered Metal Building

28,000± SF Pre-Engineered Metal Building

by Motleys Industrial
Event Begins: Thursday,  March  26,  9:00 AM Eastern
First lots ends Friday,  March  27,  3:44:40 PM Eastern
Last lot ends Friday,  March  27,  3:44:40 PM Eastern
Public Auction - 28,000± SF Pre-Engineered Metal Double A-Frame Building (BUILDING ONLY - NO REAL ESTATE). THIS LOT STARTS CLOSING 03.27.20 @ 3:30PM EDT.
28,000+/- SF Pre-Engineered Metal Double A-Frame Building (BUILDING ONLY - NO REAL ESTATE) 28,000+/- SF Pre-Engineered Metal Double A-Frame Building (BUILDING ONLY - NO REAL ESTATE)

28,000+/- SF Pre-Engineered Metal Double A-Frame Building (BUILDING ONLY - NO REAL ESTATE)

Lot #1 (Sale Order 1 of 1)

28,000+/- SF Pre-Engineered Metal Double A-Frame Building (BUILDING ONLY - NO REAL ESTATE).

PLEASE NOTE:  A Contractor is Available to Disassemble the Building, Label Each Piece for Re-Install and Load on Flatbed Truck for Delivery. Price:  $14,500.  Call for details. 

Bid Not Accepted!

Bid Accepted!

You've been outbid!

Sold for: USD 41,000.00

You've been outbid  to d****9! to YOU!

Placing your bid. please wait...