20d 9h Left
Winchester Model 61 Slide Action Rifle with Box{"message":"In _app.tsx child of Layout","renderCount":1}
Winchester 22 long leader staynless old box
Lot Closed
Auction by Anstine Auctions, LLC(301)
This item is in Kingsville, MO
Similar Items
13d 14h Left
50 Rounds Winchester Western X 32 Long Colt 82gr Lead Ammunition$10.009d 12h Left
WINCHESTER BOX OF (50) 22 SHORT CARTRIDGES$0.2513d 14h Left
50 Rounds Winchester 1986 Limited Edition 22 WRF Ammunition$10.0014h 50m Left
20 Rounds Winchester 300 H&H Magnum$15.009d 19h Left
500 Rounds Winchester Wildcat 22$7.006d 13h Left
Winchester 67 .22 SHORT, LONG, LONG RIFLE$20.0018d 12h Left
Remington/Winchester .30-30 Ammunition 120 Rds$75.0018d 12h Left
Estate Rifles .22 2 Pcs Lot Rifles$125.0020d 9h Left
Pre-World War II Winchester Model 62 Rifle with Factory Box$1,300.0013d 13h Left
400 Rounds Vintage Winchester .22LR 40gr KopperKlad Ammunition$10.0018d 12h Left
Estate Rifles .22 2 Pcs Lot Rifles20d 9h Left
Winchester Model 61 Smoothbore Rifle$2,500.0013d 13h Left
Vintage Box Winchester 405 WIN 300gr SP Ammunition$20.0018d 12h Left
Black Hills/Magtech .44-40 Ammunition 150 Rds24d 8h Left
Winchester Model 67 22S/L/LR Bolt Action Rifle (4913)$2.0018d 12h Left
Miscellaneous Estate Ammunition Lot20d 13h Left
WINCHESTER MODEL 9422 .22 SHORT/LONG/LR CALIBER LEVER ACTION CARBINE$425.0018d 12h Left
Estate Rifles .22 2 Pcs Lot Rifles$100.0014h 50m Left
31 Rounds Old Pistol Ammo & Box$10.0018d 12h Left
Winchester/HSM .454 Casull Ammunition 140 Rds18d 12h Left
Remington/Hornady .338 Win Mag Ammo 58 Rds19d 8h Left
(R) Winchester Model XPR .350 Legend Rifle$10.0020d 9h Left
Engraved Winchester Model 61 Rifle with Box$1,800.0024d 8h Left
Henry Model H001T Lever Action .22 Cal. Rifle (5259)$170.009d 14h Left
PARTIAL BOX - WINCHESTER 45/70 BLANKSOverview of Winchester 22 long leader staynless old box
Item Details
Payment
ALL ITEMS MUST BE PAID FOR IN FULL AND FFL MUSTBE RECEIVED BEFORE ANY ITEMS WILL BE SHIPPED
CheckMoney OrderWire TransferCash
Auction Details
RARE COLLECTION OF GUNS/COINS/STOCKYARD MEMORBILLAPO Box 98, Kingsville, MO, 64061Friday, May 4, 2018 | 10:30 AM CDT
Auction House
Terms Of Sale
NO GUNS WILL BE SOLD TO THE STATE OF CALIFORNIA. ALL GUNS WILL BE SHIPPED TO YOUR LOCAL FFL GUN DEALER UNLESS YOU HAVE A FFL. SHIPPING FOR HAND GUNS WILL BE $25 AND RIFLES WILL BE $30. THERE MOST LIKLEY WILL BE A FEE FROM YOUR LOCAL FFL PERSON